we produce
Gypsum Board Production Line,if you need our products,pls contact us.
3.Conveying system
Semi-finished plasterboard from formation section is automatically edge trimmed into continuous palsterboard, conveyed to concreting station and automatically cut.
4. Transferring system
Transferring section Concreted plasterboard automatically transferred and cut in middle, saving raw material.
5. Drying system
Plasterboard Transferred automatically into drying room which has shelves 5-storey or 6-storey supporting 2 lapped sheets, with 50m, 60m, 70m, and 90meters length range.
 |
| Gypsum Board Production Line |
After-sale services
1) The machine guarantee 1 years except the easy worn parts such as
bearings, electric buttons.
2) machine installation and commission: 2 to 4 months when the buyer
prepare the installation and commission conditions.
3) we offer engineers train the buyers' worker to operate the machine and
after you master the machine then pay us the installation and commission payment.
4) In order to guarantee the machine running, each year we will send engineer to
check and development the technology with the buyer.
5) If the buyer can not run the machine well then we will send the production engineers to
help the buyer to run the machine, and we can cooperate for long terms.